Orb Dynamics
Orb Dynamics
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

    Account

    • My Account
    • Sign out

    • Sign In
    • My Account

    projects

    A selection of projects is presented below to demonstrate the scale and complexity of our past work.  These include ORB projects, projects where ORB was a subconsultant, and projects were ORB engineers performed a key role with other consultancies prior to joining ORB.

    Edgbaston International, Birmingham, UK

    Dynamic Analysis of the new pavilion and facilities for Warwickshire County Cricket Club in Birmingham, England.

    dynamic analysis dynamic testing stadium dynamics

    London Dance Studio, UK

    Dynamic Assessment of the floor of a large commercial unit for conversion to a dance studio. 

    dynamic analysis dynamic testing floor dynamics

    Mbombela Stadium, Nelspruit, RSA

    Full dynamic assessment of the bowl structure of this new stadium in South Africa, constructed to host the World Cup 2010.

    dynamic analysis dynamic testing stadium dynamics

    School Floor Dynamics, Vietnam

    Assessment of the dynamic performance of a school for the response from a proposed sporting facility on the roof.

    dynamic analysis dynamic testing floor dynamics

    Hospital Sensitive Equipment, Hong Kong

    Full dynamic analysis of a hospital floor to assess the expected vibrations at sensitive equipment locations.

    dynamic analysis dynamic testing floor dynamics

    Copyright © 2026 Orb Dynamics - All Rights Reserved.

    Powered by

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    DeclineAccept